Power Train Disassembly & Assembly
15. Install Dri-Loc fasteners into the case halves.
Refer to the following steps a and b.
a. Install four capscrews and washers into the case
halves. The distance between the fasteners must
be equal. Tighten the fasteners to a torque of 105
to 125 lb•ft (143 to 169 N•m) in a progressive
criss-cross pattern opposite each other.
b. Install the other fasteners into the case halves.
Tighten the fasteners to the same torque value.
16. Inspect the rotating resistance of the differential
gears. Use the following procedure.
Checking the Rotating
Resistance of the Differential
Gears
NOTE : Make a tool for inspecting the rotating
resistance of the differential gears. The tool can be
made from an axle shaft that matches the spline size
of the differential side gear.
1. Install soft metal covers over vise jaws to protect
the ring gear.
2. Place the differential and ring gear assembly in the
vise. Secure the ring gear in vise.
3. Install the tool into the differential until the splines
of the tool and one side gear are engaged.
31