EasyManua.ls Logo

Doosan Mega 500-V - OPERATION

Doosan Mega 500-V
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
022-00029AE Operation and Maintenance Manual Operation 3-1
3
OPERATION
INSTRUMENT PANEL CONTROL FUNCTIONS
MONITORING SYSTEM
Monitoring system uses network circuits between control system and sensors installed at various machine
system locations to monitor selected conditions. This monitoring systems function is to continually inform
operator of machine’s condition. Displays and gauge readouts on instrument panel provide information
such as engine speed, engine coolant temperature, transmission oil pressure, and electrical charge status.
NEW MACHINE BREAK-IN PROCEDURES
All wheel loaders are inspected and adjusted before leaving the factory. However, it is required that the
operator follow these steps during initial break-in period. Failure to follow these steps may result in damage
to equipment or reduced performance.
1. Make sure to check all fluid levels before starting and every 8 to 10 operating hours.
2. Do all Daily maintenance and service checks.
3. For first 50 operational hours, as shown by Hour Meter on control console, do not exceed 80% of
maximum rated engine speed.
4. At end of first 50 operational hours, drain engine oil. Replace engine oil filter and engine oil.
WARNING!
Before operating any wheel loader, read and understand "Operating Controls" section of this
manual.

Table of Contents

Related product manuals