6. Installation Procedure
Integrate the feeder into cutter as shown below:
a. The front bottom of feeder conveyor has 2 ball bearings. Align the bearing with the guides
on the feeder supporting chassis.
b. Push the feeder all the way into position, the bearing will contact the limit both sides.
c. Lock the caster brake.
d. Connect the interface cable with the cutter.
e. Connect the grounding wire between feeder and cutter.