EasyManua.ls Logo

Dux 2F136S - Commissioning Checklist

Dux 2F136S
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electric Boosted Solar
25
H3163 025247 Rev. C
Tick Task See Step No.
Installer’s Guide read 1
Safety audit conducted 2
Existing tank removed 3
New storage tank safely positioned on a level surface 4
Cold and hot water pipes connected 5
Collectors aligned and attached to roof 6 – 11
Fittings attached to collectors 12 – 16
4 Way Union Assembly fitted 17
Anti-Frost Valve fitted 18
Roof penetration sealed with a flexible waterproof flashing 19
Temperature sensor installed 20 – 21
Non return valve fitted 22
PTR valve fitted 23
GPO installed 24
Tempering valve fitted 25
Commissioning the water heater 26
Commissioning Checklist

Other manuals for Dux 2F136S

Related product manuals