Powerbox Pro series User Manual
16
Ensure that the battery is in a shutdown state
1. Connect the ground cable
2 Electrical installation
4.Communication interface connection
3.2.1 Floor installation
When the battery system is placed directly on the ground, a fixed support must be used
to fix the top of the battery box on the wall.
3. Press the marked position with the
electric drill and trepanning 4 holes
with a diameter of 10mm on the wall.
The hole depth shall be greater than
70mm for fitting the expansion bolt of
M6.
1. Use the positioning cardboard
(provided in accessory package)
and mark the screw hole positions
on the wall, as shown in the four
holes on the left.
2. The bottom of board must be
good connection with the ground
level while marking the holes.