105
K000000000EJ 023826A0 100714
OK
07/08/14
10:00
Existing piping
Configuration
Stabilization
min
1
Print
auto
Fuel
L.P.G.
Test gas
Air
Type test
complete
Volume
dm
3
18.0
Measure volume
Calculate volume
OK
07/08/14
10:00
Existing piping
Calculate volume
V-
Material
Steel
Diameter
in
3/8"
Lenght
m
10.0
Zero volume
Volume
18.0
dm
3
Partial
1.2
dm
3
V+
07/08/14
10:00
Existing piping
Calculate volume
V-
Material
Steel
Diameter
in
3/8"
Lenght
m
10.0
Zero volume
Volume
18.0
dm
3
Partial
1.2
dm
3
V+
V-
Subtracts the volume of the
section of piping entered.
V+
Adds up the volume of the
section of piping entered.
07/08/14
10:00
Existing piping
Configuration
Stabilization
min
1
Print
auto
Fuel
L.P.G.
Test gas
Air
Type test
complete
Volume
dm
3
18.0
Measure volume
Calculate volume
OK
07/08/14
10:00
Existing piping
Calculate volume
V-
Material
Steel
Diameter
in
3/8"
Lenght
m
10.0
Zero volume
Volume
19.2
dm
3
Partial
1.2
dm
3
V+
07/08/14
10:00
Existing piping
Configuration
Stabilization
min
1
Print
auto
Fuel
L.P.G.
Test gas
Air
Type test
complete
Volume
dm
3
19.2
Measure volume
Calculate volume
OK
Starts the
tigh
tness test
(see
section
12.9.2).
Starts the
tightness test
(see
section
12.9.2).
Sets the material of the section of piping.
Sets the nominal diameter of the section of piping.
Sets the length of the section of piping.
Zeroes the volume previously acquired.
Total volume acquired.
Volume of the section of piping set below.