EasyManua.ls Logo

Eaton 9135 - UPS Setup; Rackmount Setup

Eaton 9135
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Eaton 9135 5000/6000 VA UPS User’s Guide 164201726—Rev 4 www.eaton.com/powerquality 17
UPS Setup
The Eaton 9135 UPS is designed for flexible configurations and can be installed in a rack or as a standalone
cabinet.
If you are installing the UPS in a rack, continue to the following section, “Rackmount Setup;” otherwise,
continue to “Tower Setup” on page 21.
Rackmount Setup
The rail kit can be mounted in standard 19-inch racks from 61–76 cm (24–30 inches) deep and includes:
l
Left and right sliding rail assemblies
l
(20) M4x6 mm Phillips
®
flat-head screws
l
(4) M4x10 mm Phillips round-head screws
l
(4) M6x12 mm Phillips round-head screws
l
(8) M6x12 mm Phillips flat-head screws
l
(2) mounting brackets
l
(2) rear hold-down brackets
Installing the Rail Kit
CAUTION
l
DO NOT install the UPS or EBM in a hermetically closed environment without any exchange of
air.
l
The UPS and EBM are heavy (see Table 13 on page 44): 1) Eaton strongly recommends to
remove the battery tray from the UPS before lifting. 2) A minimum of two people are required to
lift the cabinets into the rack.
NOTE The rails and the necessary mounting hardware are supplied by Eaton.

Other manuals for Eaton 9135

Related product manuals