Installation
Eaton 9135 5000/6000 VA UPS User’s Guide 164201726—Rev 4 www.eaton.com/powerquality 20
6. Loosen the assembly wing nuts on both rail assemblies and adjust the rail size for the depth of your rack
(see Figure 7).
7. Select the proper holes in the rail for positioning the UPS in the desired location in the rack.
8. Using two M6x12 mm flat-head screws, attach the rail to the rear of the rack.
9. Secure the rail to the front of the rack with two M6x12 mm screws.
10. Repeat Steps 8 and 9 for the other rail.
Figure 7. Installing the Rails
11. Optional. Install the rear hold-down brackets (included with the rail kit) if you need to move the rack
enclosure with the UPS already rack-mounted inside (see Figure 8).
Figure 8. Installing the Rear Hold-Down Brackets