M O T I O N
Down
Up
"SP1" Leveling
"DS" Down Slow
"DF" Down Fast
VF Drive Type 3
Setting "07" ABB-VF, PDL VF
Note:
1. To initiate a run,
"PRV" must be active
prior to run.
"PRV" is not required on inspection.
The end of the run is initiated by loss of leveling.
BRK then holds up for SDX time and then UD,U/D is
held up for ST2 time in 10ms increments.
SDX time must be less than ST2 time
"DN" Down
"UD" Up/Down
"BRK" Brake
"SP1" Leveling
"US" Up Slow
"UF" Up Fast
"UP" Up
"UD" Up/Down
"BRK" Brake
2. On inspection SP3 turns on for insp speed.
On inspection SP1 turns off.
"SDX"
time
"ST2"
time
"SDX"
time
"ST2"
time
DS/US UF/DF SP1
FUNCTION
1 1 1
1 1
11
1
1 1
1
1 0 0
0
0
0
0 0
0
0
N/A 0 rpm
RPM / Contract fpm x 10 = set for 10fpm
RPM / Contract fpm x 50 = set for 50fpm
RPM / Contract fpm x 10 = set for 10fpm
RPM / Contract fpm x 25 = set for 25fpm
RPM / 0.75 = set for 75% Cont Spd
Set as per motor rpm sync spd (RPM)
ECD DRV Setting - "07"
FAST
INTER
SLOW
LEV
INSP FAST
INSP SLOW
N/A
SPEED
DS/US UF/DF SP1
MULTI REF. FUNCTIONS
1 1 1
1 1
11
1
1 1
1
1 0 0
0
0
0
0 0
0
0
N/A 0 rpm
Set for 10fpm
Set for 50fpm
Set for 10fpm
Set for 25fpm
Set for 75% Cont Spd
Contract Speed (as a %)
FAST -M7
INTER -M3
SLOW -M5
LEV -M1
INSP FAST -M6
INSP SLOW -M2
N/A
SPEED
ABB VF
PDL VF. MULTI REF.
3 WIRE CONTROL
MF14 MF16MF15