EasyManua.ls Logo

Ecolab Lub-O-Mat 2.5 - Installation Guide; Connection Arrangement Overview; Wall Mounting Instructions

Ecolab Lub-O-Mat 2.5
72 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
417101637_Lub-O-Mat
- 34 -
Rev. 03-07.12
5. Installation
5.1 Overview of connection arrangement: Lub-O-Mat
Fig. 5.1
Pos
Description
1
Non-return valve
2
Flow sensor water
3
Fresh water connection
4
Connection for suction lance plug (3-pin)
5
Suction pipe or suction lance connection
6
EMP II E60 metering pump
7
Terminal box with fuse
8
Main switch and display elements
9*
Flow meter (OGM Plus oval gear meter ) 
belt lubricant concentrate
10
Metering line
11
Metering valve
12
Sampling
13
Mixing chamber
14
Consumer connection
* optional
5.2 Wall mounting: Lub-O-Mat
Fig. 5.2
The following parts are supplied for wall
mounting:
Qty
Description
Artcle no.
4
Wood screws, 8 x 60 mm
413110926
4
Dowel pinx
417200005
4
Distance roll
386313-02
4
Washer
413500363
These parts are available in full in a kit
bearing article number 283575.
NOTE
Take care to ensure ease of access for purposes of servicing!
Install the metering station in the immediate vicinity of the storage facility
(canister, barrel, container or tank), to keep the suction line as short as possible.

Table of Contents

Related product manuals