Ecolab Nalco Water STORM Settling Rate Monitor - Installation

Ecolab Nalco Water STORM Settling Rate Monitor
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 4 of 31
4 INSTALLATION
4.1 STORM Panel Location
The STORM™ unit should normally be installed on the Thickener bridge, adjacent to the centre-
well. Common installation practice is to use the bridge handrails to mount the unit. The
STORM™ cabinet is provided with four (4) mounting brackets located at the rear of each corner
of the cabinet.
Figure 4-1 : Panel Mounting Details
4.2 Sample Hose Location
The sample point should be located :-
In the thickener centre well.
In such a position as to give a good cross-section of the thickener feed.