– 43 –
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
L2 Edge 10-Port GE PoE Switch
Four adhesive foot pads
Grounding screw
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Power Cord
This Installation Guide
Documentation CD (Includes Management Guide)
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Edge-Core ECS2000-10P and is the answer not in the manual?

Edge-Core ECS2000-10P Specifications

General IconGeneral
BrandEdge-Core
ModelECS2000-10P
CategorySwitch
LanguageEnglish

Related product manuals