EasyManua.ls Logo

Edwards iXM200 User Manual

Edwards iXM200
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Dry Pump System
iXM
INSTRUC
TION MANUAL
M56635880_D Original ins
trucons
edw
ardsvacuum.com

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Edwards iXM200 and is the answer not in the manual?

Edwards iXM200 Specifications

General IconGeneral
Ultimate Vacuum0.1 Pa (0.00075 Torr)
TypeDry pump
Outlet FlangeDN 40 ISO-K
Max. Inlet Pressure1000 hPa (14.5 psi)
Operating Ambient Temperature5°C to 40°C (41°F to 104°F)
Storage Temperature-20°C to 60°C (-4°F to 140°F)
Inlet PortNW40, NW50, CF63
Outlet PortDN 40 ISO-K

Summary

CE Declaration of Conformity

Additional Legislation and Compliance

EU EMC, ROHS, and REACH Compliance

Details on EU EMC, ROHS, and REACH regulations and exemptions.

China Material Content Declaration

General Description of iXM Pumps

Overview and Applications

General overview of the iXM series dry pumps, their features, and intended applications.

Control and Monitoring Features

Details on EdCentra for monitoring and the Green Mode functionality.

Technical Data - General Specifications

Operating Conditions and Materials

General technical specifications, operating conditions, and materials in contact with gases.

Technical Data - System Specifications

Loading, Purge, and Electrical Data

Technical data on loading, nitrogen purge, and electrical requirements for the system.

Technical Data - System Specifications (cont.)

Cooling Water and Heater Data

Technical data for cooling water systems and heater specifications.

Tracer Gas Analysis

Installation Procedures

Safety, Preparation, and Positioning

Critical safety warnings, unpacking, inspection, and positioning guidelines for installation.

System Connections

Procedures for connecting vacuum, exhaust, nitrogen, electrical, and water supplies.

Additional Safety Equipment Installation

Instructions for installing additional safety equipment for system protection.

Commissioning and Testing

System Commissioning and Leak Testing

Step-by-step procedure for commissioning and leak testing the system.

PDT System Configuration

Configuring the system using the Pump Display Terminal (PDT).

Operation and Configuration

Start-up and Shut Down Procedures

Various methods for starting up and shutting down the pump system.

Module and Temperature Configuration

Adjusting gas module and system operating temperatures.

Maintenance Procedures

Connection Inspection

Procedure for inspecting system connections, pipelines, cables, and fittings.

Fault Finding and Diagnostics

Warnings, Alarms, and Events

Information on system warnings, alarms, events, and their indicators.

Inverter Issues and Troubleshooting

Details on system events and troubleshooting inverter warnings and alarms.

Decommissioning and Transportation

Decommissioning Safety and Relocation

Safety precautions, relocation, and draining procedures for decommissioning.

Transportation Guidelines

Guidelines for safely transporting the system.

Storage Procedures

Disposal Procedures

Service and Returns

Equipment Return Procedure

Process for returning equipment for service, including required forms.

System Accessories

Disconnect Boxes and Accessory Modules

Information on disconnect boxes and accessory modules.

PDT and Related Accessories

Details on Pump Display Terminal, holsters, and extension cables.

Mounting, Flow Control, and Interface Modules

Information on seismic brackets, flow switches, and interface modules.

Related product manuals