18
VNXe3100 Installation Guide
 
Figure 13  DPE Front LEDs 
Ensure the power-up is complete and that the system is ready before you continue.
Attach the bezels
1. Locate the bezels for each installed component.
2. Attach the bezel that corresponds to each component as shown in 
Figure 14 on page 19. Each 
bezel can be locked in place by turning the key one quarter turn clockwise.
Installation 
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
SAS   450 GB  15K RPM
Disk drives 
(Blue)
DPE Power On
(Blue)