EasyManua.ls Logo

Emerson 1410S - Physical Installation

Emerson 1410S
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Physical installation
4.1 Emerson 1410S2 mounting
Find a location where the Gateway has convenient access to the host system
network (process control network).
4.1.1 Pipe mount
Prerequisites
The following hardware and tools are needed to mount the Gateway to a 20-
in. pipe:
Two 5/16-in. u-bolts (supplied with Gateway
2-in. mounting pipe
1/2-in. socket-head wrench
Procedure
1.
Insert one u-bolt around the pipe, through the top mounting holes of
the Gateway mounting bracket, and through the washer plate.
2. Use a 1/2-in. socket-head wrench to fasten the nuts to the u-bolt.
3. Repeat for the second u-bolt and the lower mounting holes.
Figure 4-1: Emerson 1410S2 Mounting
March 2020 Quick Start Guide
Quick Start Guide 15

Table of Contents

Other manuals for Emerson 1410S

Related product manuals