EasyManua.ls Logo

Emerson Keystone OM1 - EPI2 - Assembling Procedure for Models 250-500-1000-2000 Nm Old Version (US or Non-US Market)

Emerson Keystone OM1 - EPI2
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, Operation and Maintenance Manual
VCIOM-01494-EN Rev. 0
June 2022
7
Installation
Section 2: Installation
2.2 Assembling Procedure for Models
250-500-1000-2000 Nm Old Version
(US or Non-US Market)
Detect the 4 black cables required for the OM1 which are already included in the
basic actuator; disassemble local mechanical indicator as shown in Figure 10.
Figure 10
In Figure 11, connect the at cable furnished into the kit to connector J9 on OM1.
In Figure 12, connect the OM1 at cable to the connector on the logic board.
Figure 11

Related product manuals