Installation, Operation and Maintenance Manual
VCIOM-01494-EN Rev. 0
June 2022
9
Installation
Section 2: Installation
2.3 Assembling Procedure for Models 63-125 Nm
New Version (US or Non-US Market)
• Detect the 3 black cables required for the OM1 which are already included in the
basic actuator as shown in Figure 15.
• Connect the at cable furnished into the kit to connector J9 on OM1 as shown in
Figure 16.
Figure 15
Figure 16