3.3 Connect the 9-wire cable
Procedure
1. Prepare and install the cable according to the instructions in the Micro Motion 9-Wire
Flowmeter Cable Preparation and Installation Guide.
2. Insert the stripped ends of the individual wires into the terminal blocks of the
junction box. Ensure that no bare wires remain exposed.
3. Match the wires color for color. For wiring at the transmitter or remote core
processor, refer to the transmitter documentation.
4. Tighten the screws to hold the wires in place.
5. Ensure integrity of gaskets, then tightly close and seal the junction box cover and all
housing covers.
6. Refer to the transmitter installation manual for signal and power wiring
instructions.
Installation Manual Transmitter power and I/O wiring
20002346 January 2019
Installation Manual 17