NetSure 501 A50, NetSure 501 AA0, NetSure 701 A51
19-Inch Subrack Power Supply System
User Manual
Version V1.0
Revision date June 13, 2008
BOM 31011680
Emerson Network Power provides customers with technical support. Users may contact the nearest
Emerson local sales office or service center.
Copyright © 2008 by Emerson Network Power Co., Ltd.
All rights reserved. The contents in this document are subject to change without notice.
Emerson Network Power Co., Ltd.
Address: No.1 Kefa Rd., Science & Industry Park, Nanshan District 518057, Shenzhen China
Homepage: www.emersonnetworkpower.com.cn
E-mail: support@emersonnetwork.com.cn

Table of Contents

Other manuals for Emerson NetSure 501 AA0

Question and Answer IconNeed help?

Do you have a question about the Emerson NetSure 501 AA0 and is the answer not in the manual?

Emerson NetSure 501 AA0 Specifications

General IconGeneral
BrandEmerson
ModelNetSure 501 AA0
CategoryPower Supply
LanguageEnglish

Summary

Safety Precautions

Electrical Safety

General electrical safety guidelines and warnings for power systems.

Hazardous Voltage Safety

Warnings and procedures related to hazardous voltage in the system.

Thunderstorm Safety Precautions

Safety precautions to take during thunderstorms.

Short Circuit Hazards

Hazards and precautions related to short circuits.

Battery Handling Safety

Safety precautions and procedures for battery handling.

Chapter 2 Installation Instruction

Safety Regulations for Installation

Essential safety rules to follow during installation.

Mechanical Installation Procedures

Procedures for physically installing the equipment.

Electrical Installation Guidelines

Guidelines for connecting electrical components.

Connecting AC Input Cables

Instructions for connecting AC power input cables.

Connecting Load Cables

Procedures for connecting DC load cables.

Connecting Battery Cables

Steps for safely connecting battery cables.

Chapter 3 Installation Testing

Installation Check and Startup Procedures

Procedures for verifying installation and initial startup.

Basic System Settings

Initial configuration of the monitoring module parameters.

Alarm and System Status Check

Testing alarms and verifying system operation status.

Chapter 4 Use Of Monitoring Module M500D

Alarms: Querying and Setting

How to view and manage system alarms.

Chapter 5 Use Of Monitoring Module M800D

M800D Parameter Setting

Accessing and setting various system parameters.

Battery Management Parameters

Parameters related to battery management and testing.

Chapter 6 Use Of Monitoring Module M501D

Querying Rectifier Status

Checking the operational status of individual rectifiers.

Alarms: Querying and Handling

How to view and manage system alarms.

Querying Active Alarms

Procedures for checking currently active alarms.

System Maintenance Procedures

Procedures for performing system maintenance.

Setting System Parameters

How to configure various system parameters.

Alarm Settings Configuration

Detailed configuration for system alarms.

Chapter 7 Alarm Handling

Handling System Alarms

Procedures for managing critical, major, and observation alarms.

Handling Rectifier Faults

Diagnosing and resolving rectifier faults.