29
Safety Manual
00809-0400-5100, Rev AB
Operation and Maintenance
November 2019
Operation and Maintenance
3.6 Maintenance
The proof test procedure should be carried out at regular intervals as described in “Proof
test” on page 14.
The devices in the Rosemount Tank Gauging Safety System may only be repaired or
modified by authorized personnel trained by Emerson Automation Solutions / Rosemount
Tank Gauging.
For firmware upgrade use the procedure in the Rosemount 5900S Radar Level Gauge
Reference Manual
. Check release notes prior to upgrade, see the Rosemount Tank Gauging
web site Emerson.com
.