EasyManua.ls Logo

Enterasys B5K125-48P2 - Rack Mounting the Switch; Guidelines for Rackmount Installation; Area Guidelines for Switch Installation on Flat Surface

Enterasys B5K125-48P2
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack Mounting the Switch
2-4 Installation
Ifyouareinstallingseveralswitchesinastack,proceed toConnectingHighSpeedStacking
Cablesonpage 26. Iftheswitchisbeinginstalledasastandaloneswitch,proceedto
ConnectingACPoweronpage 210forpowerconnectioninstructions.
Figure 2-2 Area Guidelines for Switch Installation on Flat Surface
Rack Mounting the Switch
Toinstalltheswitchina19inchrack,youneed:
•Tworackmountbracketsandmountingscrews(rackmountkit)shippedwiththeswitch.
•Fourcustomersuppliedscrewstoattachtheswitchtoastandard19inchrack.
Guidelines for Rackmount Installation
Theinstallationsitemustbewithinreachofthenetworkcablingandmeettherequirementslisted
below:
Appropriategroundedpowerreceptaclesmustbelocatedwithin152cm(5ft)ofthelocation.
•Atemperatureofbetween0°C(32°F)and50°C(122°F)mustbemaintainedattheinstallation
sitewithfluctuationsofless
than10°C(18°F)perhour.
1 Approximately 152 cm (5 ft) from power source 3 44.5 cm (19.4 in.) for proper ventilation
2 4.45 cm (1.75 in.) per switch. (Vertical clearance
depends on number of switches stacked.)
4 41.9 cm (16.5 in.) for proper ventilation
Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of
5.1 cm (2.0 in.) at the left and right of the switch.

Table of Contents

Other manuals for Enterasys B5K125-48P2

Related product manuals