EasyManua.ls Logo

Enterasys B5K125-48P2 - Finalizing the Installation

Enterasys B5K125-48P2
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Completing the Installation
2-30 Installation
RefertoFigure 220asyouperformthefollowingprocedure.
ToconnectanLCorMTRJcableconnectortoanSFPor10Gportconnector:
1. Removetheprotectivecovers(notshown)fromtheuplinkportSFP/10Gandfromthe
connectorsoneachendofthecable.
2. Insertthecableconnectorinto
theSFP/10Gconnectoruntilitclicksintoplace.
Figure 2-20 Cable Connection (LC shown) to Uplink Port with SFP/10G Installed
3. Plugtheotherendofthecableintotheappropriateportontheotherdevice.Somecablesmay
beterminatedattheotherendwithtwoseparateconnectors,oneforeachfiberopticstrand.
Inthiscase,ensurethatthetransmitfiberopticstrand
fromtheB5switchisconnectedtothe
receiveportoftheotherdevice,andthereceivefiberopticstrandontheB5switchis
connectedtothetransmitportoftheotherdevice.
4. RepeatthisprocedureforotherSFP/10Gports,ifneeded.
5. IfanSFP/10Gportisunused,installadust
cover.
Completing the Installation
Afterinstallingtheswitchandmakingtheconnectionstothenetwork,accesstheswitch
management,asdescribedbelow.
Initial Logon to Switch Management
ToinitiallyaccessswitchmanagementfromyourlocalPC,terminal,ormodemconnection,
proceedasfollowsatthedisplayedstartupscreen:
1. Enterrw(ReadWrite)forUsername.
2. AtthePasswordprompt,pressEnter(RETURN).
Note: Leave the protective covers in place when the connectors are not in use to prevent
contamination.
1 Combo SFP port with transceiver installed 2 LC cable connector 3 Release tab

Table of Contents

Other manuals for Enterasys B5K125-48P2

Related product manuals