EasyManuals Logo

Enterasys B5K125-48P2 User Manual

Enterasys B5K125-48P2
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #63 background imageLoading...
Page #63 background image
Checking the LEDs
Enterasys B5 Gigabit Ethernet Switch Hardware Installation Guide 3-5
UP LED
TheSTACKUPLEDindicate sthestateoftheconnectiontotheswitchstackdownconnector,as
describedinTable 33.
DOWN LED
TheSTACKDOWNLEDindicatesthestateoftheconnectiontotheswitchstackupconnector,as
describedinTable 34.
Table 3-3 UP LED Definitions
Color State Recommended Action
Off No valid connection to switch stack down
connector.
1. Make sure the switch connected to the
stack down connector is powered on.
2. Replace cable with a known good one.
3. If the problem still exists, contact
Enterasys Networks for technical support.
Green Solid. Valid connection to switch stack
down connector.
None.
Blinking. Information is being transferred
through the high-speed stacking cable.
None.
Table 3-4 DOWN LED Definitions
Color State Recommended Action
Off No valid connection to switch stack up
connector.
1. Make sure the switch connected to the
stack up connector is powered on.
2. Replace cable with a known good one.
3. If the problem still exists, contact
Enterasys Networks for technical support.
Green Solid. Valid connection to switch stack up
connector.
None.
Blinking. Information is being transferred
through the high-speed stacking cable.
None.

Table of Contents

Other manuals for Enterasys B5K125-48P2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Enterasys B5K125-48P2 and is the answer not in the manual?

Enterasys B5K125-48P2 Specifications

General IconGeneral
BrandEnterasys
ModelB5K125-48P2
CategorySwitch
LanguageEnglish

Related product manuals