3 • Description of the Controls
26 / 62
80110-201_V24169
2022-01
Controls on the back
Fig. 3-2
(1) Purge pin
see chapter Installation.
(2) Argon connection
see chapter Installatio.
(3) High-pressure sensor
see chapter Installation.
(4) ECB sockets
The ECB (Erbe Communication Bus) enables communication between the electrosur-
gical unit and connected units.
(5) Potential equalization
see chapter Installation.