12
3 EXTEND THE MOUNTING RAIL TO THE NEXT BEAM, TRUSS OR PURLIN.
>250 mm
4
Doestheouterpaneledgeprojectmorethan250mmbeyondthelasthangerbolt?Thenextendthemountingrailsoit
goes50mmbeyondthenexthangerboltandattachthemountingrailhere.Thisextra50mmprovidessucientlength
totanendcap(articleno.1008066(-B))tothemountingrails.Fortheendclampyoumustthenusetheendclamp
support(articleno.1008065(-B)).
3 INSTALL THE HANGER BOLTS
Areyouinstallinghangerboltsinawoodenroofstructure?Thencontinuetostep3.1.
Areyouinstallinghangerboltsinaconcreteroofstructure?Thencontinuetostep3.3.
1 PREDRILL THE HOLES IN THE ROOF (WOODEN SUBSTRUCTURE:
PURLINS/TRUSSES)
>50 mm
3
Thesubstructuremustbeatleast50mmthick.
3
Clearthedrillholeandsurroundingareaofdrillcuttings.
3
Forcorrugatedroof:usetheexistingscrewholesasmuchaspossible.Makesurethatyoudonotplacetoomanyscrews
inacorrugatedroof,becausethentheroofmaterialwillnothaveenoughspacetoworkthermally.
Diameter of hanger bolt Drill through roong material Predrill holes in roof structure
M10 Ø12,5mm Ø5mm
M12 Ø14mm Ø7mm