EasyManuals Logo

eta SH User Manual

eta SH
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
33
2012-11
Installation Side panels, boiler control system
SH Montage
Side panels, boiler control system
Place insulation on top of boiler
Place the largest piece of insulation in the middle
of the boiler's top side.
Attach boiler control system to door frame
Loosen both M8 long nuts on the inner side of the
door frame. Place the boiler control system on the
boiler and remove the cable ties. Fasten the boiler
control system to the door frame with the long
nuts.
Install left and right side panels
Attach the side panels to the rear side of the boiler
with 6 M5 X 10 round-headed screws.
Attach the side panels to the front side of the boiler
with 4 M5 X 10 round-headed screws.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the eta SH and is the answer not in the manual?

eta SH Specifications

General IconGeneral
Brandeta
ModelSH
CategoryBoiler
LanguageEnglish

Related product manuals