EasyManua.ls Logo

ETS SolarForce 652V - Page 21

ETS SolarForce 652V
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25809-02A
Assembly Procedures - 19
Parts needed:
Ceiling assembly (box 5)
(6) #8-32 x 3/4” Phillips screws
NOTE: Wiring deleted from
illustration for clarity.
Lower the Ceiling assembly onto the
top of the booth. Pass the wiring har-
nesses (not shown) through the holes
directly above each harness so no
wires get pinched beneath the
Ceiling.
Secure the Ceiling in place with the
six screws in the holes indicated by
arrows in the detail above, right.

Related product manuals