3.3.6 Installation directly with chemical anchor: *
If the installation already has an adequate concrete floor or there is a problem to make a hole in the
ground (ie. multi-storey car park) the Charger can also be installed by chemical anchor.
1. Make sure to mark every hole of the charger over the floor
2. Drill 5 holes on the floor for M12 threaded rod. Take into account the required drilling depth.
3. Blow into the holes to eliminate the rests of the drill.
4. Inject the adhesive starting at the bottom of the holes.
5. Introduce the M12 threaded rod within the work time.
6. Adjust the distance of the threaded rod and wait for the curation time. A = 8 cm
*This is the advised procedure. Follow in every moment the instruction of your chemical anchor
system.