8.
5.1. FIRST START UP
• Opentheexternalsupplyofwatertothemachine.
• Ifthemachinehasvisuallevelindicator,lltheboilerbetweenthemaximumand
minimum level.
• Turnonthemainpowerswitch.
• Pressthebrewswitch,oroneselectiononthecontrolpaneloneachgroup,untilwater
comes out continuously from each of them. This way the heat exchangers of the machine
willbecorrectlylled.
• Turnonthesteamknob,untilsteamcomesout.Thiswaywewillevacuatethe
remaining air that could be trapped in the boiler.
“The red pilot, shows us the machine is heating-up. Once it turns OFF, it means the machine has
reachedtheidealtemperature”.
5. FIRST START UP New Elegance
5.2. THE PORTAFILTER SET
1.- Tension spring (Filter basket)
2.- Placement of tension spring.
3.-Placingportaltertensionspring.
Porta-lter<erbasket Porta-lter<erbasketfor1espressodosis
for 2 espresso dosis
Portalterlockingintothegroup
Theporta-lterhastwolittlewingsateachside;
these ones must be aligned with the
screw slots in the group. Then turn the porta
counter-clockwisetilltheporta-lterhandle
is perpendicular to the espresso machine.
1 2 3