New Elegance
CLEANING AND CARE
Changing the group gasket
To remove the porta-lter, use a
straight-blade screwdriver to release
the shower by prying down with
medium force.
Remove the lter basket(A), then
place the new gasket and shower(B)
into the porta-lter(C).
Remove the shower and gasket.
Preheat the gasket to soften the rubber. A - heat the gasket for 15 seconds
using the water from the hot water outlet, or B - place the gasket, shower, and
porta-lter in hot water for 30 seconds.
Remove and discard the old gasket.
Insert the new gasket (chamfer and
EXPOBAR logo facing up) into the
shower.
15s
30s
99
O
C
A
A
B
C
B
> 65
O
C
Relling the boiler
This operation should be performed by service personnel following the steps listed below:
Switch off the machine and wait until the boiler has depressurised (leave the steam tap open until no more
steam emerges) and the water has cooled.
Open the boiler drain tap and wait until the boiler is completely empty.
To empty machines not fitted with a boiler drain tap, remove the anti-depression valve, pump the water
out of the boiler and then replace the anti-depression valve.
Switch on the machine to refill the boiler automatically.
Regular maintenance
Regenerating the water softener
To regenerate the water softener, follow the instructions in the user manual.
Important:
Make sure that the drainage tube is firmly connected to the drain, as the water in the boiler may
be extremely hot.