MAX300-RTG : Installation Manual Appendix A: Preinstallation
Checklist
86
9. Will external services need to be provided via a VPN? Yes___No___N/A___
a. If so is one set up? Yes___No___N/A___
b. Does Extrel have any information regarding the VPN?
Yes___No___N/A___
(Please provide all information available regarding the VPN)
10. Has the roughing pump been filled with the proper oil? Yes___ No___
11. Do you have a list of the required calibrations gases, specified by Extrel?
(Typically found in the final quotation, along with the stream analysis) Yes___ No___
a. Do you have all of these required gases and appropriate
regulators on site? Yes___ No___
b. Do the component concentrations displayed on the individual
bottles match those specified by Extrel exactly? Yes___No___
c. Are all of these gases plumbed to the inlet valve(s) of the
MAX300? Yes___No___
d. Have all the fittings been checked for leaks? Yes___No___
12. Are all sample streams available? Yes___No___
a. Are all of these streams capable of delivering 50 - 100 cc / min. Yes___No___
through the MAX300 sampling inlet?
b. Have all the sample streams been plumbed to the inlet Yes___No___
valve(s) of the MAX300 and the fittings checked for leaks?
c. Have the valve flow-by vents for all sample streams been Yes___ No___
plumbed to a suitable atmospheric pressure exhaust line or bulkhead?
d. If the sample stream is being delivered by tubing larger than
1/16” OD, has a flow-by been installed where the two different
sizes are joined to ensure fresh sample and short clearing delays?
Yes___No___N/A___
e. Are all sample streams properly conditioned to remove Yes___No___
any particulates and / or to prevent condensation?