EasyManua.ls Logo

Extrel MAX300-RTG - Page 87

Default Icon
87 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAX300-RTG : Installation Manual Appendix A: Preinstallation
Checklist
87
13. Are all the spare parts (pump oil, copper gaskets, fittings, etc.)
available? Yes___No____
14. Has all documentation required for on-site visits
Yes___No___N/A___
(i.e., safety, insurance, etc.) been completed?
15. Is special clothing required? Yes___No___
(i.e., hard hat, steel toed shoes, flame-retardant overalls, etc.)
a. If yes to above, will this clothing be provided?
Yes___No___N/A___
16. Are there any restrictions regarding facial hair? Yes___ No___
17. Will technician be required to attend any advance safety training?
Yes___No___N/A___
18. Will technician be required to sign any forms?
Yes___No___N/A___
(i.e., work releases, waivers, hold harmless, etc.)
a. If yes, have you included all the above forms for review by Yes___No___
Extrel CMS LLC, along with this Installation Checklist?
Please reference the Extrel MAX300-_RTG Installation Manual for specific information
regarding customer responsibility during installation / startup.
This form must be signed by the responsible individual, verifying that all necessary
preparations have been made. If the Technical Support Representative arrives on-site and
preparations are either incomplete or improper, the commissioning may be terminated. The
customer will then be responsible for all additional cost necessary to complete the
commissioning, and billed at current published rates.
Upon completion, please email support@extrel.com at least fourteen (14) days prior to
scheduling. If possible, please include a map and / or directions for locating your facility, and
information on available lodging.
Print Name: Phone:
Customer Signature: Date: