EasyManua.ls Logo

EZ-ACCESS PATHWAY 3G - Page 51

EZ-ACCESS PATHWAY 3G
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 51 of 72
5.6.12. Attach the tube with threaded inserts installed to the platform handrail post and the
horizontal picket closure bracket using 5/16”-18 x 1” long hex bolts and 5/16” flat
washers but do not tighten fully (FIG. 5.20).
5.6.13. Repeat the steps above until all five 1 1/2″ diameter round tubes and curb have been
installed then tighten all fasteners securely. For the curb, use the hole which is 1/2”
above the lowermost hole in the platform post and horizontal picket closure bracket to
align the curb correctly.
FIG. 5.20

Table of Contents