loop detector
ENGLISH
fig.2
fig.3
fig.4
Operator 615BPR
Photocells
Key-operated push-button
Flashing lamp
Receiver
To ensure safety and an efficiently operating automated
system, make sure the following conditions are observed:
• When moving, the beam must not, on any account,
meet any obstacles or overhead power cables.
• The soil must permit sufficient stability for the foundation
plinth.
• There must be no pipes or electrical cables in the plinth
excavation area.
• If the barrier body is exposed to passing vehicles, install,
if possible, adequate means of protection against
accidental impact.
1) To lay cables, use adequate rigid and/or flexible
tubes
2) Always separate connection cables of low voltage
accessories from those operating at 230v~. To prevent
any interference whatever, use separate sheaths.
2. ELECTRIC PREPARATIONS (standard system)
3 DIMENSIONS
Dimensions are in mm.
4.1 PRELIMINARY CHECKS
4 INSTALLING THE AUTOMATED SYSTEM
4.2 MASONRY FOR FOUNDATION PLATE
4.3 INSTALLING THE UPRIGHT
4.4 INSTALLING THE BEAM
The 615BPR automated system is always supplied
in the right-hand version – for left-hand installation,
see chapter 5.5.
1) Make sure that the rod of the piston secured to the rocker
is completely extended (corresponding to the beam’s
vertical position).
2)
Remove and store the breather screw as shown in fig.6
3) Assemble the bar as in fig.7a for the rectangular
version, or as in fig.7b for the round version.
1) Remove the cover, unscrewing the screws securing it to
the upright.
2) Using the four nuts and washers supplied, secure the
upright on the foundation plate as shown in fig.5
Remember that the hatch of the upright should normally
face the building.
1) Check if the balancing spring matches the type of beam
installed: see chapter 5.
2) While keeping the beam in vertical position, assemble
the tie rod and spring as shown in fig.8
3) Release the operator (see chapter 7) and position the
beam at 45°, then adjust the tie-rod and set the spring until
the weight of the beam is balanced in that position.
4) Restore normal operation as described in chapter 7.
4.5 INSTALLING AND ADJUSTING THE BALANCING
SPRING
1) Make a foundation plate as shown in fig.4 (referred to
clayey soil)
2)
Wall the foundation plate as shown in fig.4, supplying
one or more sheaths for routing electrical cables. Using a
spirit level, check if the plate is perfectly level. Wait for the
cement to set.