14
13
B614 21 732998 - Rev.A
1
2
4
1
1
2
3
Translation of the original instructions
ENGLISH
FIXING THE CABLES INSIDE THE BARRIER
Li
130 cm of cable are necessary.
1. (13) Arrange the cables inside the barrier. Fix
the cables with the cable ties provided 1, 2 and 3.
2. (14) Remove bolt with washer 1. Open cable
tie 2. Bring the cables to the board.
3. Use the screw and washer 1 to close the cable tie.
Li
The electrical connections must be made after com-
pleting the mechanical installation