EasyManua.ls Logo

Faema FAEMINA - Water Installation Rules; Installation Check-Up; Washing; Operation Test

Faema FAEMINA
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
194.0°F
English
Checkthecorrecttemperaturevalues
GROUPS
Hookupthelterholdertotheunit(withoutco󰀨ee).
Dispensewaterforaboutaminute.w
HOT WATER
Continuouslydispensehotwater(usingtheappropriatekey)untilatleast1litreofwaterhasbeen
used.
STEAM (alsowithAutosteam)
Dispensesteamfromthenozzlesforaboutaminute,usingtheappropriatebuttons.
WARNING: ONCETHE MACHINE HASBEEN INSTALLEDAND IS READYFOR USE,
BEFORE USING IT, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONSBELOW:
3. Installation Check-up
3.1 WASHING
3.2 OPERATION TEST
2.3 Water Installation Rules (Watersoftenerlter:wherepresent)
Waterusedinco󰀨eemachinesmustbesuitableforhumanconsumption(seelawsandregulations
inforce).
The machine is equipped with a lter-softener that needs to be replaced periodically based on
consumptionandqualityofwaterused.
Thereplacementofthelter-softeneratthescheduledexpirydatesisfundamentalforthe
quality of the beverages dispensed.
In addition, lack of maintenance is detrimental to the correct functioning of the appliance.
Replacethelterwhenindicatedbythemachineoratleastonceevery18months.
Thereplacementintervalcanbechangedonthesoftware,aftercheckingthewaterhardnessusing
thesameproceduresindicatedinthechapter“ChangingFilter-Softener”.
Checkthatboilerandoperatingpressureis
normal.
Press the key for 5
seconds.
07MAY21
Friday15:59:03
02_FAEMINA_USA.indd 502_FAEMINA_USA.indd 5 26/09/2022 15:09:1426/09/2022 15:09:14

Related product manuals