10
1
194.0°F
3
4
194.0°F
194.0°F
194.0°
English
9. First start-up
1
Thewarming-upphaselastsforabout12 minutes
and,
inthecaseofrststart-up,endswiththeappearance
onthedisplayofthesymbolindicatingthelowlevelof
waterinthetank:
Withoutswitchingthemachineo,repeattheoperations
ofloadingwaterintothetankillustratedabove.
2
Thesubsequentwarming-upphasewillendwhenthe
displayindicatestheoperatingpressure:
andthecoeeboilertemperatureisdisplayed.
06MAY2021
Thursday16:27:01
BOILERCONTROL
Hookupthelterholder(withoutcoee)totheunit.
Scaldinghazard!
Warning: perform the operations with the greatest care
Pressoneofthecoeekeysanddispensewaterforafew
seconds;tostopthedispensingpressthesamekeyagain.
Inthis way harmonisation betweenthe temperature of
theunitandthatofthelterholderisfacilitated,aswell
asrinsingthewatercircuit.
Coeeunitsymbols
Boilertemperatureindication.
Pre-infusionphase,representedwiththesymbol andrelative
duration.
Dispensingphase,representedwiththesymbol andrelative
duration.
barindicatingthetotalprogressoftheoperation.
Thisiconappearswhenthecoeeboilerisswitchedonandindicates
whenthesettemperaturehasbeenreached.
Thisiconindicatesthatthecoeeboilerisheatingup.
02_FAEMINA_USA.indd 1002_FAEMINA_USA.indd 10 26/09/2022 15:09:1826/09/2022 15:09:18