EasyManua.ls Logo

Fahrenheit Technologies Endurance 50F - Introduction

Fahrenheit Technologies Endurance 50F
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Before Starting The Furnace For The
First Time
1. Outside air is required. Use only approved parts. Check
that the outside air inlet is connected to draw fresh air from
outside the building.
2. All joints of PL vent and single wall stainless steel pipe
should be fastened by at least 3 screws and correctly
installed. (Follow vent manufacturers’ recommended instruc-
tions). Seal all joints with high temperature silicone to create
an airtight seal.
Unpacking the Furnace
Remove two bolts underneath that hold the unit to the skid for
shipping. These bolts can be used for mobile home installation.
The front door handle will need to be installed with the screws
provided. (See figure 2).
For use in the U.S. and Canada, mobile home approved.
Check with local authorities and obtain needed permits.
Installation is to be performed by a
qualified professional.
WARNING
The high temperature paint on this furnace may
take several hours of burning at a high fuel
setting to fully cure. During this time, an odor
that is not harmful may be evident. When odors
are present, the area around the Furnace should
be well ventilated.
CAUTION
The high temperature paint can be easily
scratched prior to the first time the furnace is lit.
ENDURANCE 50F INTRODUCTION
INTRODUCTION