16
The interconnecting cables suppled as standard may not be long enough for your
installation, in which case you must provide longer cables. The following information gives
specific wiring details and highlights any special requirements, however as with all equipment
not supplied with the Merlin system, it is the installer’s responsibility to ensure that these
cables comply fully with the applicable safety and EMC regulations.
2.4 CABLING
Once the mechanical installation of the Engine is complete, a number of cables must be
connected. Some of these connect various components together and may have been supplied
with the Merlin system, others provide connection to the rest of the environment.
QDC Card
System I/O Panel
Engine Back Panel