EasyManua.ls Logo

FBD 772 - User Interface Navigation; Keypad Layout and Functions

FBD 772
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
STARTING UP THE DISPENSER
Leak Check and Prime
1 Remove the side panels by loosening the two screws located at the bottom of the panel and
then lifting off the frame.
2 Remove the drip tray by lifting and pulling forward and then remove the splash plate and front
cover to expose the solution modules.
3 Connect the BIB connectors to the syrup BIBs.
4 Establish the water supply and the CO2 supply. Note: the water and syrup pumps will
activate until the lines are pressurized.
5 Thoroughly check for leaks at all connections.
6 Install a ¼” I.D. tube on the sample port shown below. Open the sample valve and collect
the water/syrup in a cup. Continue to prime until syrup flow has been established and all air
has been removed from the lines. Discard the samples.
7 Repeat for all barrels.
Sample Valve on Solution Module
Sample Valve
(shown closed)
Sample port
(tube not shown)

Other manuals for FBD 772

Related product manuals