EasyManua.ls Logo

FEIERDUN FOR01 - User Manual

FEIERDUN FOR01
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SMITH MACHINE
User Manual
FOR01
Question and Answer IconNeed help?

Do you have a question about the FEIERDUN FOR01 and is the answer not in the manual?

Summary

FEIERDUN SMITH MACHINE FOR01 User Manual

Parts List

Wrench Tools

Details specific wrench tools included in the package for assembly and use.

Assembly Instructions

Step 1: Assemble Base Components

Connect the bottom tubes, connection tubes, and side weight plate frames using specified bolts, washers, and nuts.

Step 2: Attach Support Frames and Cross Beams

Connect support frames to bottom tubes, slide assembly, attach upright frames, and install upper cross beams and connection tubes.

Step 3: Install Weight Support Tubes and Plates

Attach weight support tubes and special-shaped plates (circular and square holes) to bottom tubes and upper cross beams.

Step 4: Connect Front Tube and Fixed Shafts

Attach the upper front connection tube and connect plates to cross beams, and insert fixed shafts into weight support tubes.

Step 5: Install Rear Weight Guide Tubes and Frames

Insert rear weight guide tubes, rubber cushions, big washers, springs, and weight plate frames into the main structure.

Step 6: Attach Fixing Brackets and Front Guide Tubes

Insert fixing brackets, attach connect plates, install front weight guide tubes, and assemble components onto them.

Step 7: Connect Lever Tubes and Pulley Blocks

Connect lever fixed tubes, sliding tubes, OB tubes, and pulley blocks, then attach footplate support and footplate.

Step 8: Attach Hooks, Handles, and Foam Tubes

Attach hooks, handles, safety catch arms, foam tubes, leg foam rollers, reverse U, and reverse bushing to the frame.

Step 9: Install Fixed Tubes and Weight Plate Frames

Insert fixed tubes, attach reserve tube, insert small weight plate frames, OB tubes, and barbell spring clips.

Step 10: Attach Trim Panels and Accessories

Attach trim panels, slide barbell spring clips, attach chain to lower bar, and connect various bars to the upper connection tube.

Step 11: Cable Installation and Strap Handle

Install pulleys, bushings, and cables onto various frame components and attach the strap handle.

Contact Information

Exploded Drawing

FEIERDUN FOR01 Specifications

General IconGeneral
BrandFEIERDUN
ModelFOR01
CategoryFitness Equipment
LanguageEnglish