1 4 5
2 3
6968
4
Mark out the connector position on the surface of the worktop
at the desired point. Also mark the positions for additional
dominos (used to ensure a flush connection).
For this connection, you need at least two flat
connectors and the following components from
the DOMINO corner and flat connector system:
2 x double-headed bolts including DOMINO
connector covers
4 x transverse anchors including studs
Optional: 8 x enlarging clips for the transverse
anchors
Optional: 2 x dominos D14 x 75
Optional: 4 x cover caps in silver, light brown or
dark brown
2016_FES_DOMINO_Book_GB-en.indb 68 03.03.16 12:13