EasyManua.ls Logo

FineTek EPD30 - Inspection before Power-On

FineTek EPD30
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
DC24V
Digital output 1
RS-485 communication
Digital input
DO1-
DO1+
D-
D+
DI-
DI+
V+
V-
P-
P+
mA-
mA+
DC24V
Voltage pulse
output
4-20mA output
13. Inspection before Power-On
1. Check whether the flow meter is damaged during transportation and installation.
2. Check whether the voltage of the power supply is consistent with that specified on
the nameplate.
3. Check whether the fuse used is of the correct current value.
4. Check whether the flow meter is grounded correctly.
5. Open the pipe valve to fill the pipeline system with liquid. One should pay attention
to removing the leaked gas and residuals in the system.
6. Power on the flow meter to warm up for 10 minutes. Then it can work normally.

Table of Contents