STRADA GENERATION3 – S5 - INSTALLATION MANUAL
49/66
7.7 Installing the equipment
7.7.1 Terminal
Installing the terminal requires the following:
a torque wrench 24,
2 to 4 M16 nuts and 4 M16 washers (included in the anchoring kit),
2 removal protective nuts (option supplied with the terminal),
a spirit level.
To prevent the terminal from sinking in the concrete, which would make it impossible to
open the lower door and to install the terminal, never install the terminal on a non-dry
concrete surface.
Positioning the terminal
A. Use a spirit level to check that the 4 lower nuts form a horizontal support plane.
B. Install the carrying tool provided by Flowbird on the housing, upper and lower doors
closed, above the lower door, the position depending on the space available around
the terminal.
Recommended positionning of the carrying tool