DMX/DMXD/DMXH/DMXDDMX/DMXD/DMXH/DMXD
INSTRUCTIONS INSTRUCTIONS
Page 19 of 60Page 19 of 60
A quality, high strength, non-shrink cementatiousA quality, high strength, non-shrink cementatious
grout material shall be used for installation. Epoxy isgrout material shall be used for installation. Epoxy is
A layered combination of non-shrink cementatiousA layered combination of non-shrink cementatious
grout and normal industrial concrete can be used.grout and normal industrial concrete can be used.
See sketch below for example.See sketch below for example.
The first layThe first lay
30 - 40 mm of normal grout material as described30 - 40 mm of normal grout material as described
normal industrial normal industrial
poured to a level that is approximately 30-40 mmpoured to a level that is approximately 30-40 mm
from the top of the baseplate decking.from the top of the baseplate decking.
normal grout normal grout
as described in 4.3.1.1.as described in 4.3.1.1.
25 – 50 mm 25 – 50 mm
Normal concreteNormal concrete
sketches below.sketches below.
Template for hanging foundation boltsTemplate for hanging foundation bolts
The sketch illustrates a recommended foundationThe sketch illustrates a recommended foundation
bolt arrangement. Notice the large washer withbolt arrangement. Notice the large washer with
lugs at the bottom. It should be welded to the boltlugs at the bottom. It should be welded to the bolt
and pipe sleeve to prevent turning.and pipe sleeve to prevent turning.
Foundation complete descriptionFoundation complete description
the foundation the foundation
grout materials.grout materials.
Before grouting, check level ofBefore grouting, check level of
machined pads of baseplate in both directions andmachined pads of baseplate in both directions and
perform a rough shaft/coupling alignment. Alignmentperform a rough shaft/coupling alignment. Alignment
after grout has set will not be possible if above is notafter grout has set will not be possible if above is not
satisfactorily completed.satisfactorily completed.
manufacturer's instructions.manufacturer's instructions.
Holes are provided in the baseplate to permitHoles are provided in the baseplate to permit
pouring the grout and distributing. Vent holes arepouring the grout and distributing. Vent holes are
also provided in each compartment. Fill under thealso provided in each compartment. Fill under the
baseplate completely, stirring to assure properbaseplate completely, stirring to assure proper
distribution of the grout. Check to see that thedistribution of the grout. Check to see that the
grout flows under the edges of the baseplategrout flows under the edges of the baseplate
Building dam around the foundation before pouringBuilding dam around the foundation before pouring
FOUNDATION ROUGH DOFOUNDATION ROUGH DO
NOT FINISH WITH TROWELNOT FINISH WITH TROWEL
ALLOW BOLTS TO PROJECTALLOW BOLTS TO PROJECT
FOR GROUTING UNDERFOR GROUTING UNDER
THREADED BOLTTHREADED BOLT
ROUGH CONCRETEROUGH CONCRETE
STUFF WASTE AROUNDSTUFF WASTE AROUND
BOLT WHILE POURINGBOLT WHILE POURING
PIPE SLEEVE TO BEPIPE SLEEVE TO BE
DIAMETER OF ANCHORDIAMETER OF ANCHOR
WASHER WITH LUGSWASHER WITH LUGS
TO THE BOTTOM OFTO THE BOTTOM OF
BOLT & PIPE SLEEVEBOLT & PIPE SLEEVE