EasyManuals Logo

Flowserve DMXD User Manual

Flowserve DMXD
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
DMX/DMXD/DMXH/DMXDDMX/DMXD/DMXH/DMXD
H H
USER USER
INSTRUCTIONS INSTRUCTIONS
ENGLISH ENGLISH
71569282 71569282
- -
10/0910/09
Page 19 of 60Page 19 of 60
4.3.1 4.3.1
Grouting Grouting
materialmaterial
4.3.1.1 4.3.1.1
Normal Normal
grout grout
materialmaterial
A quality, high strength, non-shrink cementatiousA quality, high strength, non-shrink cementatious
grout material shall be used for installation. Epoxy isgrout material shall be used for installation. Epoxy is
preferred.preferred.
4.3.1.2 4.3.1.2
Layered Layered
grout grout
materialmaterial
A layered combination of non-shrink cementatiousA layered combination of non-shrink cementatious
grout and normal industrial concrete can be used.grout and normal industrial concrete can be used.
See sketch below for example.See sketch below for example.
a) a)
The first layThe first lay
er shall er shall
be 25 be 25
– 50 – 50
mm plus a mm plus a
layer oflayer of
30 - 40 mm of normal grout material as described30 - 40 mm of normal grout material as described
in 4.3.1.1.in 4.3.1.1.
b) b)
The The
second second
layer layer
is is
normal industrial normal industrial
concreteconcrete
poured to a level that is approximately 30-40 mmpoured to a level that is approximately 30-40 mm
from the top of the baseplate decking.from the top of the baseplate decking.
c) c)
The The
top top
layer is layer is
30-40 mm 30-40 mm
normal grout normal grout
materialmaterial
as described in 4.3.1.1.as described in 4.3.1.1.
30-40 mm30-40 mm
25 – 50 mm 25 – 50 mm
unlessunless
as specifiedas specified
Normal concreteNormal concrete
30-40 mm30-40 mm
aa
cc
bb
4.3.2 4.3.2
Grouting Grouting
method method
AA
a) a)
Prepare Prepare
the the
foundation foundation
properly properly
as as
specified specified
inin
sketches below.sketches below.
Template for hanging foundation boltsTemplate for hanging foundation bolts
The sketch illustrates a recommended foundationThe sketch illustrates a recommended foundation
bolt arrangement. Notice the large washer withbolt arrangement. Notice the large washer with
lugs at the bottom. It should be welded to the boltlugs at the bottom. It should be welded to the bolt
and pipe sleeve to prevent turning.and pipe sleeve to prevent turning.
Foundation complete descriptionFoundation complete description
b) b)
Build a Build a
dam around dam around
the foundation the foundation
to to
containcontain
grout materials.grout materials.
Before grouting, check level ofBefore grouting, check level of
machined pads of baseplate in both directions andmachined pads of baseplate in both directions and
perform a rough shaft/coupling alignment. Alignmentperform a rough shaft/coupling alignment. Alignment
after grout has set will not be possible if above is notafter grout has set will not be possible if above is not
satisfactorily completed.satisfactorily completed.
c) c)
Grout Grout
leveling leveling
space space
and and
baseplate baseplate
as as
perper
manufacturer's instructions.manufacturer's instructions.
Holes are provided in the baseplate to permitHoles are provided in the baseplate to permit
pouring the grout and distributing. Vent holes arepouring the grout and distributing. Vent holes are
also provided in each compartment. Fill under thealso provided in each compartment. Fill under the
baseplate completely, stirring to assure properbaseplate completely, stirring to assure proper
distribution of the grout. Check to see that thedistribution of the grout. Check to see that the
grout flows under the edges of the baseplategrout flows under the edges of the baseplate
evenly.evenly.
FINISHEDFINISHED
GROUTINGGROUTING
DAMDAM
Building dam around the foundation before pouringBuilding dam around the foundation before pouring
groutgrout
LEAVE TOP OFLEAVE TOP OF
FOUNDATION ROUGH DOFOUNDATION ROUGH DO
NOT FINISH WITH TROWELNOT FINISH WITH TROWEL
ALLOW BOLTS TO PROJECTALLOW BOLTS TO PROJECT
FOR GROUTING UNDERFOR GROUTING UNDER
BASEPLATEBASEPLATE
MAKE THISMAKE THIS
DISTANCEDISTANCE
EQUAL TO LUGEQUAL TO LUG
ON BASEPLATEON BASEPLATE
BOLTBOLT
PIPEPIPE
WASHERWASHER
ROUGH FINISHROUGH FINISH
FOR GROUTFOR GROUT
ALLOW AMPLEALLOW AMPLE
THREADED BOLTTHREADED BOLT
LENGTH ABOVELENGTH ABOVE
ROUGH CONCRETEROUGH CONCRETE
STUFF WASTE AROUNDSTUFF WASTE AROUND
BOLT WHILE POURINGBOLT WHILE POURING
CONCRETECONCRETE
PIPE SLEEVE TO BEPIPE SLEEVE TO BE
THREE TIMESTHREE TIMES
DIAMETER OF ANCHORDIAMETER OF ANCHOR
BOLTBOLT
WELD A LARGEWELD A LARGE
WASHER WITH LUGSWASHER WITH LUGS
TO THE BOTTOM OFTO THE BOTTOM OF
BOLT & PIPE SLEEVEBOLT & PIPE SLEEVE
TO PREVENTTO PREVENT
TURNINGTURNING

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Flowserve DMXD and is the answer not in the manual?

Flowserve DMXD Specifications

General IconGeneral
BrandFlowserve
ModelDMXD
CategoryWater Pump
LanguageEnglish

Related product manuals