EasyManuals Logo

Franke A1000 Original Operating Instructions

Franke A1000
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
Capacities (in accordance with DIN 18873-2)
Hourly capacity
Cups/h
Single prepa-
ration
Double prepara-
tion
Espresso 160 238
Coffee/café crème 109 141
Milk coffee 158 260
Cappuccino 149 200
Latte macchiato 114 200
Hot chocolate 129 -
Hot water 165 -
A1000 technical data (FCS4059)
Bean hopper 1.2kg per grinder
Powder container 1.2kg (may differ from this, depending on the powder used)
Grounds container 60—110 cakes, depending on the grind quantity (grounds ejection option)
Boiler Coffee: 0.9l; 2.5kW (at 230V); operating pressure 800kPa (8bar)
Hot water: 0.9l; 2.5kW (at 230V) operating pressure 800kPa (8bar)
Steam: 0.9l; 2.5kW (at 230V) operating pressure 100kPa (1bar)
Noise emission < 70dB
Weight Approx. 58kg without packaging; approx. 64kg with packaging
Water connection G 3/8" outside thread
Water pipeline pressure 0.8—8.0bar
Water shut-off With check valve and filter
Water hardness 4—8°dH (German total hardness)
7—14°fH (French total hardness)
70—140 ppm (mg/l)
Chlorine content <0.5mg/l
Acid content/ph value 6.5—7.5 pH
Funnel d = 50mm with siphon
Drain line dmin = 1"
Ambient conditions Humidity: max. 80%
Ambient temperature: 10—32° C
Energy loss/day
(incl. refrigeration unit SU12
FM)
3.165kW
Electrical connection
(see type plate)
CH/GB/EU 380—415 V/50 –60 Hz3L N PE6.3—7.5 kW
220—240 V/50 –60 Hz1L N PE2.6—3.0 kW
220—240 V/50 –60 Hz1L N PE4.4—5.0 kW
220 —240 V/50 –60 Hz3L PE5.6—7.9 kW
USA (UL) 220—240 V/60 Hz2L PE4.5—5.3 kW
JP 200—220 V / 50 –60 Hz2L PE4.5—6.3 kW
200—220 V / 50 –60 Hz3L PE6.8—8.1 kW
CN 380 V/50 Hz3L NPE6.3kW
Preparations
•The power connection for the coffee machine must be pro-
tected by a ground fault circuit interrupter (FI).
•Each terminal of the power supply must be able to be inter-
rupted by a switch.
•The fixed water connection must have a water shut-off with a
check valve and filter that can be inspected and must meet
the requirements of the technical data.
•The fixed water connection to your coffee machine must be
done using the hose set that is supplied with it. Do not use
any other water hoses that happen to be present.
Installation
You must have completed these preparations before one of our
Service technicians can install the coffee machine for you.
Your Service technician will install your coffee machine and
carry out the initial commissioning. The technician will walk you
through the basic functions.
Your A1000 must be properly installed so that you can operate it correctly – your service technician will gladly do that for you.
You'll have to take care of a few things first. You'll find the requirements for problem-free enjoyment of your coffee machine here.
INSTALLATION AND TECHNICAL DATA

Table of Contents

Other manuals for Franke A1000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Franke A1000 and is the answer not in the manual?

Franke A1000 Specifications

General IconGeneral
ModelA1000
BrandFranke
CategoryCoffee Maker
Daily OutputUp to 300 cups
MaterialStainless steel
Frequency50/60 Hz
Dimensions340 x 600 x 750 mm
Power Supply220-240 V
Displaytouchscreen

Related product manuals