070.650-IOM (JUL 19)
Page 21
SGC/SGX ROTARY SCREW COMPRESSOR
INSTALLATION
Figure 8: Port locations, SGC 2824 (continued)
422.4 [16.63]
757.2 [29.81]
2500.9 [98.46]
Ă381 [Ă15.00]
279.4 [11.00]
317.5 [12.50]
635 [25.00]
558.8 [22.00]
381 [15.00]
581.1 [22.88]
127 [5.00]
1681.7 [66.21]
62 [2.44]
SC-13
120.7 [4.75]
SC-9
34.8 [1.37]
34.7 [1.37]
120.7 [4.75]
607.1 [23.90]
SC-13
SC-13
SC-13
483.1 [19.02]
241.6 [9.51]
175.8 [6.92]
81 [3.19]
215.1 [8.47]
SM-1
SC-8
79.8 [3.14]
SC-7
240.3 [9.46]
SC-8
379.5 [14.94]
990.5 [39.00]
168.4 [6.63]
134.7 [5.30]
146.1 [5.75]
SL-1
SV-1
97.7 [3.85]
387.3 [15.25]
10.7 [.42]
327.2 [12.88]
TE-1
381 [15.00]
SD-1
CONSULT SERVICE MANUAL
CAUSE INJURY DUE TO SPRING
IMPROPER DISASSEMBLY MAY
BEFORE DISASSEMBLY.
SC-13
ESCAPING GAS MAY CAUSE INJURY
3. REFER TO INSTALLATION OPERATION AND
MAINTENANCE MANUAL FOR ADDITIONAL
1. RELIEVE PRESSURE PRIOR TO OPENING
LINES OR MAKING FIELD CONNECTIONS.
2. REMOVE CHARGING VALVES OR GAUGES
PRIOR TO PRESSURIZING SYSTEM.
WITH NITROGEN GAS. TEMPORARY VALVES
& GAUGES HAVE BEEN INSTALLED.
THIS EQUIPMENT HAS BEEN PRESSURIZED
CAUTION
CYLINDER ASSEMBLY UNDER
CAUTION
HIGH SPRING LOAD.
TENSION RELEASE.
INFORMATION.
SC-13
SC-13
SC-8
SM-1
SL-1
SV-1
69.95
69.57
2.754
2.739
Ă
82.55
82.52
3.250
3.249
22.23
22.30
[
.875
.878
]
[ ]
[ ]
B
B
177.8 [7.00] MINIMUM
DISTANCE REQUIRED
FOR SHAFT SEAL
REMOVAL
MOUNTING FOOTC
L
MOUNTING HOLE 33.3
[ 1.312]THRU 4 PL
DISCHARGE FLANGE 8 IN. CLASS
300 ANSI FLANGE
M22 X 2.5-6H 35.1 [1.38] DP 12
PL EQUALLY SPACED ON A
330.2 [ 13.00] B.C.
OUTLET END
VIEW B-B
SCALE 1:2