EasyManua.ls Logo

Frick SGXH-4021 - Volumizer Volume Ratio Control

Frick SGXH-4021
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
070.650-IOM (JUL 19)
Page 34
SGC/SGX ROTARY SCREW COMPRESSOR
INSTALLATION
VOLUMIZER VOLUME RATIO CONTROL
Open valve at SC3
Open valve at SC4
Compressor Vi increase: The volume ratio Vi is increased
whenMSSsolenoidvalveYY3isenergizedandoilowsfrom
the oil manifold through valve ports P and A to compressor port
SC3, enters the increase side of the cylinder and overcomes
thedecreasedspringtension.Simultaneously,oilowsfrom
SC4 port through valve ports B and T to compressor suction.
Compressor Vi decrease: The volume ratio Vi is decreased
whenMSSsolenoidvalveYY4isenergizedandoilowsfrom
the oil manifold through valve ports P and B to compressor
port SC4, enters the decrease side of the cylinder. Simultane-
ously,oilowsformSC3portthroughvalveportsAandTto
compressor suction.
To control the rate of vi change, throttle the needle valve at
SC3 port.

Table of Contents

Related product manuals