In “Boiler off” status:
❒
Open the insulated door (A)
❒ Remove the key plate (B) from the safety limit switch
❒ Open the side clamps (C), remove the ash container cover and check the ash
level in the two chambers
➥ If either of the two chambers is more than two thirds full, empty the ash
container
❒ Put the cover on the ash container and use the side clamps (C) to close it again
❒ Open the ash container clamp using the locking lever (D)
❒ Remove the ash container from the boiler
❒
Close the two openings at the back of the ash container with the slide plates
Starting at boiler type
200:
4
Operating the System
Checking the fill level of the ash container and emptying if required