"Power low" is displayed. The inverter restarts as soon as an energy manage-
ment command is sent or there is sufficient PV power available.
If the function is activated, the inverter remains permanently connected to the
grid so that energy can be drawn from other producers at any time.
Once the meter is connected, its position must be configured in the Fronius
Datamanager.
Several Fronius Smart Meters can be installed in the system. A different address
needs to be set for each Smart Meter.
The Watt value on the generator meter is the sum of all generator meters. The
Watt value on the consumption meter is the value of all consumption meters.